MMT January Observing Statistics

Time Summary

Percentage of time scheduled for observing                    90.2
Percentage of time scheduled for engineering                   9.8
Percentage of time scheduled for sec/instr change            0.0
Percentage of time lost to weather                                    45.1
Percentage of time lost to instrument                                 0.5
Percentage of time lost to telescope                                  2.8
Percentage of time lost to general facility                           0.0
Percentage of time lost to environment (non-weather)       0.0
Percentage of time lost                                                     48.4

 ——–

Breakdown of time lost to telescope: secondary (f/15 problem),

pointing/computer problem with AO, PCR server, wfs camera,

M1 panic, computer

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: