June MMT Observing Statistics

Percentage of time scheduled for observing              93.3
Percentage of time scheduled for engineering             6.7
Percentage of time scheduled for sec/instr chan         0.0
Percentage of time lost to weather                           29.7
Percentage of time lost to instrument                         0.0
Percentage of time lost to telescope                          0.0
Percentage of time lost to general facility                   0.0
Percentage of time lost to environment (non-weather)  0.0
Percentage of time lost                                           29.7

Leave a Comment